Please be advised that starting Saturday, May 12th, the 1st Floor Low-Rise elevator bank will be reopened with new finishes.

The next phase of construction will begin during that same time by closing the 2nd floor Low-Rise elevator bank.

Please review the directions below to access the 2nd floor and Low-Rise floors. The bank will re-open early-July 2018 with new updated finishes.

  • Tenants Entering from the 2nd Floor Pedestrian Bridge accessing 3rd – 10th floors:

    • Please enter either the Mid-Rise or High-Rise elevator banks and take the elevator down to the 1st floor

    • You will then need to cross over to the Low-Rise elevator bank on the 1st floor and take the elevator to your destination.

  • Tenants Entering from the West (20th Street Exit), East (21st Street Exit), or North corridor on the 1st floor:

    • To access the 2nd floor, please use either the Mid-Rise or High-Rise elevator bank.

    • To access the 3rd  – 10th floors, please use the Low-Rise elevator bank.

  • Low-Rise Tenants (2-10) Descending to the Garage:

    • Please take the Low-Rise elevators to the 1st floor

    • Transfer to either the Mid-Rise or High-Rise elevator bank and take an elevator up to the 2nd floor.

    • You may also leave the building on the 1st floor through the North exit and use the crosswalk to access the garage.

We apologize for any inconvenience this may cause and appreciate your cooperation as we progress with the lobby and elevator projects.